List of 109 projects extracted from the official website of Khatam al-Anbiya Construction Headquarter in year 2020

Publish:

Dataset extracted from the official website of Khatam al-Anbiya Construction Headquarter & Transparency of contracts

areaclassificationproject statusproject namedescription
0oil, gas, petrochemicalsfield developmentunder constructionconstruction of a new gas injection station in gachsaranNaN
1oil, gas, petrochemicalsfield developmentfinishedfinal design of 3d seismic data harvesting operation in karkheh oil fieldNaN
2oil, gas, petrochemicalsfield developmentfinishedseismic operations in azadegan north oil fieldNaN
3oil, gas, petrochemicalsfield developmentfinishedtimab-changoleh three-dimensional seismic operation-
4oil, gas, petrochemicalsrefinery industriesunder constructionconstruction and civil operations of iran lng gas desalination project-
5oil, gas, petrochemicalsrefinery industriesunder constructionlaunch utility & offsite lng project-
6oil, gas, petrochemicalsrefinery industriesunder constructionconstruction of 3200 ngl liquefied natural gas and gas plant west of karun river-
7oil, gas, petrochemicalsrefinery industriesunder constructionexecution of dmc phases 2, 3, 4, 5, 9 and 10 of south pars-
8oil, gas, petrochemicalsrefinery industriesunder constructionimplementation of construction and civil operations of iran lng gas desalination project-
9oil, gas, petrochemicalsrefinery industriesfinishedsouth pars phase 15 and 16 refinery project (assaluyeh)-
10oil, gas, petrochemicalsrefinery industriesfinishedahvaz shahid chamran pump house-
11oil, gas, petrochemicalsrefinery industriesfinishednew rey oil pumps house - tabriz-
12oil, gas, petrochemicalsoil and gas storage tanksunder constructionperforming engineering services of underground crude oil reservoirs with a capacity of 10 million barrels without coverage-
13oil, gas, petrochemicalsoil and gas storage tanksunder constructionconstruction and installation of mechanical equipment and pre-design and supply of goods and implementation of two lpg tanks with a volume of 30,000 cubic meters and three lng tanks with a volume of 14,000 cubic meters-
14oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of mahshahr oil depot by epc method-
15oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign, construction and installation of oil storage tanks in the cities of tabriz, hamedan, ahvaz, yasuj-
16oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of 32,000 cubic meters of fuel tanks in shahid salimi power plant in neka-
17oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign, manufacture and installation of lng and lpg tanks in tombak port-
18oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign, manufacture and installation of 23 oil storage tanks with a capacity of 424,000 cubic meters in 11 cities-
19oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign, construction and installation of 6,000 / 100-barrel tank tanks of isfahan refinery-
20oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of four tanks of 60,000 cubic meters of gas condensate development plan of south pars gas field - phases 9 and 10-
21oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign, construction and installation of one million barrel tanks on khark island-
22oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of a reservoir of 60,000 cubic meters of gas condensate in phases 4 and 5 of south pars-
23oil, gas, petrochemicalsoil and gas storage tanksfinisheddesign and construction of 6 reservoirs in qazvin and isfahan oil depots-
24oil, gas, petrochemicalsoil and gas storage tanksunder constructionconstruction of land pipelines in the mainland of kish-
25oil, gas, petrochemicalsoil and gas storage tanksunder constructionsixth national gas pipeline (ahvaz - dehgolan)-
26oil, gas, petrochemicalsoil and gas storage tanksunder constructionabadan-arak-rey oil products transmission line-
27oil, gas, petrochemicalsoil and gas storage tanksfinishedcontinuation of the seventh national gas line-
28oil, gas, petrochemicalsoil and gas storage tanksfinished56th national gas pipeline (assaluyeh - sistan and baluchestan)-
29oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of 56-inch 10th national gas transmission line (pataveh - koleh bridge)-
30oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of khorramabad 36-inch second gas transmission line and khorramabad no. 2 pressure reducing station (khorramabad-malayer)-
31oil, gas, petrochemicalsoil and gas storage tanksfinishedconstruction of 48-inch hamedan-bijar transmission line by pc method-
32civil engineering and industryroads and urban developmentfreeways and highwaysfreeway from shrine to shrineconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
33civil engineering and industryroads and urban developmentfreeways and highwayssorkheh hesar highwayconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
34civil engineering and industryroads and urban developmentfreeways and highwayssaveh-hamadan highwayconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
35civil engineering and industryroads and urban developmentfreeways and highwaysparsayan highwayconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
36civil engineering and industryroads and urban developmentfreeways and highwaysthe main road of ilamconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
37civil engineering and industryroads and urban developmentfreeways and highwaysahwaz-sarbandar second line pavementconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
38civil engineering and industryroads and urban developmentfreeways and highwaysazadreh arak - khorramabadconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
39civil engineering and industryroads and urban developmentfreeways and highwaysmehdi shiraz koohsar highwayconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
40civil engineering and industryroads and urban developmentfreeways and highwaysthe third section is the main pataveh-dehdasht roadconstruction of between 50% of freeways in the country by khatam al-anbiya camp; 2004 km under construction and 1242 km
41civil engineering and industryroads and urban developmentintra-city and suburban railwaysline 7 of tehran metro with a length of 27 km and 24 stations276 km long city train and 142 stations
42civil engineering and industryroads and urban developmentintra-city and suburban railwaysline 2 of mashhad metro with a length of 15 km and 13 stations276 km long city train and 142 stations
43civil engineering and industryroads and urban developmentintra-city and suburban railwaysmashhad metro line 3 with a length of 28 km and 12 stations276 km long city train and 142 stations
44civil engineering and industryroads and urban developmentintra-city and suburban railwaysline 2 of tabriz metro with a length of 4.22 km and 12 stations276 km long city train and 142 stations
45civil engineering and industryroads and urban developmentintra-city and suburban railwaysline 2 of shiraz metro with a length of 8.17 km and 9 stations276 km long city train and 142 stations
46civil engineering and industryroads and urban developmentintra-city and suburban railwaysqom metro line is 14 km long and has 14 stations276 km long city train and 142 stations
47civil engineering and industryroads and urban developmentintra-city and suburban railwaysdevelopment of the southern part of tehran metro line one with a length of 52 km and 5 stations276 km long city train and 142 stations
48civil engineering and industryroads and urban developmentintra-city and suburban railwayshashtgerd new city with a length of 25 km and 2 stations276 km long city train and 142 stations
49civil engineering and industryroads and urban developmentintra-city and suburban railwayskermanshah metro line is 3.4 km long and has 6 stations276 km long city train and 142 stations
50civil engineering and industryroads and urban developmentsuburban railgorgan iron way - what's out?2,875 km are under construction and 1,300 km are under construction
51civil engineering and industryroads and urban developmentsuburban railbam iron road - zahedan2,875 km are under construction and 1,300 km are under construction
52civil engineering and industryroads and urban developmentsuburban railkerman-zahedan railway infrastructure2,875 km are under construction and 1,300 km are under construction
53civil engineering and industryroads and urban developmentsuburban railiron road - khorramabad (infrastructure and stations)2,875 km are under construction and 1,300 km are under construction
54civil engineering and industryroads and urban developmentsuburban railkermanshah iron road2,875 km are under construction and 1,300 km are under construction
55civil engineering and industryroads and urban developmentsuburban railimprovement of tehran-tabriz railway2,875 km are under construction and 1,300 km are under construction
56civil engineering and industrywater and powerwater and powerthe great karkheh dam and its dependent structurescapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
57civil engineering and industrywater and powerwater and powerupper gotvand electric dam and power plantcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
58civil engineering and industrywater and powerwater and powerkouchari damcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
59civil engineering and industrywater and powerwater and poweraghchai damcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
60civil engineering and industrywater and powerwater and powerwater transmission lines from sarab talkh dam to khorramabad water treatment plantcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
61civil engineering and industrywater and powerwater and powerwater transfer tunnel from karaj damcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
62civil engineering and industrywater and powerwater and powerqamroud water tunnel (parts 2, 3, 4 and 5)capacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
63civil engineering and industrywater and powerwater and powerthe main irrigation and drainage network of doberjcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
64civil engineering and industrywater and powerports and docksdesign and construction of pars petrochemical portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
65civil engineering and industrywater and powerports and docksshahid rajaei port development (phase 1)capacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
66civil engineering and industrywater and powerports and docksconstruction of pars service portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
67civil engineering and industrywater and powerports and docksdesign and implementation of lng portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
68civil engineering and industrywater and powerports and docksconstruction of mahshahr export portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
69civil engineering and industrywater and powerports and docksconstruction of a 150,000-ton pier (panamex) in imam khomeini portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
70civil engineering and industrywater and powerports and docksrestoration and development of concrete docks in imam khomeini portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
71civil engineering and industrywater and powerports and docksphase one of the development of kish commercial portcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
72civil engineering and industrywater and powerports and docksassaluyeh offshore marine terminalcapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
73civil engineering and industrywater and powerports and docksdeylam port dredging, bushehr kosar port, charak port, phases 13, 14, and 20-21) south parscapacity of constructed dams 14/927 billion cubic meters; 221 km water transfer tunnel; water transmission lines 3007 km; 645 km of irrigation canals and networks
74civil engineering and industrymines and mining industriesmining exploration and extractionchromite oxidation zonesconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
75civil engineering and industrymines and mining industriesmining exploration and extractionexploration of coal explorationconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
76civil engineering and industrymines and mining industriesmining exploration and extractioncopper exploratory drillingconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
77civil engineering and industrymines and mining industriesmining exploration and extractionextraction and transport of bauxite rockconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
78civil engineering and industrymines and mining industriesmining exploration and extractionextraction of lead and zincconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
79civil engineering and industrymines and mining industriesmining exploration and extractionextraction and management of phosphorous phosphate mineconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
80civil engineering and industrymines and mining industriesmining exploration and extractioniron ore miningconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
81civil engineering and industrymines and mining industriesmining exploration and extractionmining of copper minesconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
82civil engineering and industrymines and mining industriesmining exploration and extractionexploratory drillingconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
83civil engineering and industrymines and mining industriesmining industryphase two concentrated copper plantconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
84civil engineering and industrymines and mining industriesmining industrycopper refinery development planconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
85civil engineering and industrymines and mining industriesmining industrysponge iron factoryconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
86civil engineering and industrymines and mining industriesmining industrysponge iron factory and transport of steel materialsconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
87civil engineering and industrymines and mining industriesmining industrycopper fusion factoryconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
88civil engineering and industrymines and mining industriesmining industryconstruction of phosphoric acid and triple fertilizer plantconducting strategic studies to find the potential of mineral reserves, conducting exploration activities in the areas of chromite, conducting drilling and exploration brain extraction operations of more than 400,000 meters in a variety of important mines; carrying out extraction projects in iron ore mines; construction of two sponge iron factories with a combined capacity of 1,600,000 tons per year; construction of two copper concentrate plants with a combined capacity of 250,000 tons per year, construction of a copper refining plant with a capacity of 100,000 tons per year, increasing the capacity of the phosphorus phosphate plant and construction of two sulfuric acid plants and triple fertilizer
89civil engineering and industryhealthcarehealthcare-collaborate with the ministry of health to build 19,000 hospitals
90civil engineering and industrycommunication and information technologyinfrastructure communicationdesign and implementation of more than 23 thousand kilometers of fiber optic communication infrastructure network-
91civil engineering and industrycommunication and information technologyinfrastructure communicationdesign, supply, installation and commissioning, testing and delivery of 220 high-capacity data transmission stations-
92civil engineering and industrycommunication and information technologyinfrastructure communicationdesign, supply and run the largest signal transmission network using high-capacity microwave rails at 320 stations-
93civil engineering and industrycommunication and information technologycommunications in the industrial sectortelecommunications of the seventh national gas transmission line and oil pipeline-
94civil engineering and industrycommunication and information technologycommunications in the industrial sectortelecommunications and signalization of mashhad metro line 2 and 3, tehran metro line 7, tabriz metro line 2, qom metro line one-
95civil engineering and industrycommunication and information technologycommunications in the industrial sectortelecommunications and signalization of gorgan railway - incheh barun, chabahar - zahedan, yazd - eghlid, kermanshah, akhvaz - andimeshk, high-speed electric train tehran - isfahan-
96civil engineering and industrycommunication and information technologycommunications in the industrial sectorthe telecom system of the 15th, 16th, 13th, 22nd, 23rd and 24th phases of the south pars gas field and the persian gulf star condensate refinery, ngl3200, damavand petrochemical complex and ethylene petrochemical complex-
97civil engineering and industrycommunication and information technologyinformation technologyahvaz traffic control center, kermanshah-
98civil engineering and industrycommunication and information technologyinformation technology500 wireless networks of organs and organizations-
99civil engineering and industrycommunication and information technologycontrol and automationnational gas dispatching of iran-
100civil engineering and industrycommunication and information technologycontrol and automationseventh national gas transmission line and oil and gas pipeline-
101civil engineering and industrycommunication and information technologycontrol and automationkucheri dam water pipeline to qom-
102civil engineering and industrycommunication and information technologycontrol and automationaccurate control system of phases 15, 16, 13, 22, 23 and 24 of south pars gas field development and persian gulf star condensate refinery, ngl3200, damavand petrochemical complex and ethylene central petrochemical complex-
103civil engineering and industrycommunication and information technologyin progresstehran water piping system-
104civil engineering and industrycommunication and information technologyin progressfiber optic communication infrastructure network (noor 3)-
105civil engineering and industrycommunication and information technologyin progresstelecommunications and the sixth gas transmission line-
106civil engineering and industryspecial structuresspecial structuresnature bridge-
107civil engineering and industryspecial structuresspecial structuresclass bridge and sadr tunnel-
108civil engineering and industryspecial structuresspecial structurespersian gulf lake crown buildings-
109agricultureagricultureagriculturepumping station: 25 chapters\nwell drilling: 602 rings\nwell equipment: 448 rings\nwater transmission line (main and secondary lines): 219300 meters\nweight irrigation network: 12973 hectares\npressure grid: 22761 hectares\n power grid: 342 km\n1- identified lands: 216828 hectares\n2- land studies: 197000 hectares\n3- land leveling: 59649 hectares\n4- cooperative formation: 102 items\n5- green area: 35734 hectares\n7- access road: 650 km-

kaches204-109-projects-extracted-official-website-khatam-alanbiya-2020-en.csv

Dataset Period: 2020 - 2020
Source: Khatam-al Anbiya Construction Headquarter