Row | project name | location | Progress - Percent | Cost - million Rials | Area | |
---|---|---|---|---|---|---|
0 | 1 | Repair of asphalt surfaces and drilled strips | - | 15 | 555 | 1 |
1 | 2 | Manual asphalt cover | - | 70 | 1000 | 1 |
2 | 3 | Extension - infrastructure and asphalt of Razavi Street | - | 100 | 1000 | 1 |
3 | 4 | Infrastructure up to the base layer | - | 55 | 2800 | 1 |
4 | 5 | Improving the tourist park | - | 100 | 1001 | 1 |
5 | 6 | Construction of Heydarinejad and Karun neighborhood parks | - | 30 | 665 | 1 |
6 | 7 | Asphalt infrastructure and sidewalks | - | 66 | 1816 | 1 |
7 | 8 | Installation of lighting bases between the fourth and fifth bridges | - | 97 | 420 | 1 |
8 | 9 | Construction of a pedestrian bridge next to the new Abadan terminal | - | 90 | 579 | 1 |
9 | 10 | Construction of a coastal park between the suspension bridge and the island bridge | West Coast Boulevard | 100 | 4320 | 2 |
10 | 11 | Construction of a beach park between the island bridge and the black bridge | West Coast Boulevard | 100 | 6854 | 2 |
11 | 12 | Construction of a beach park between the Black Bridge and the government park | West Coast Boulevard | 100 | 6912 | 2 |
12 | 13 | Covering the asphalt of the coastal road between the Black Bridge to the Jazirah Bridge and the Naderi Bridge to the 8th Bridge | West Coast Boulevard | 100 | 4000 | 2 |
13 | 14 | Construction of sub-raw water network of embankments in the air defense route | Kianshahr | 100 | 1000 | 2 |
14 | 15 | Pavement of 18 East Kianpars Street | خ 18 Sharqi | 100 | 200 | 2 |
15 | 16 | Preparation - planting - maintenance and irrigation of quarterly seedlings in the path of defense to the old road of Ahvaz - Andimeshk | The path of Daghaghleh Bridge to the old road police | 100 | 499 | 2 |
16 | 17 | Infrastructure and asphalt of Kianshahr Farhangian Cooperative | Kianshahr Farhangian Cooperative | 100 | 2390 | 2 |
17 | 18 | Preparation and installation of granite tables of light colors next to the tables of the squares of the third square and Sayyad Shirazi | The third square of Kianpars and the square of Sayad Shirazi | 100 | 292 | 2 |
18 | 19 | Improvement of sidewalks and landscaping and asphalt paving in Dez street | Dez Street and area level | 100 | 1031 | 2 |
19 | 20 | Infrastructure and asphalt of Fadak alleys | - | 100 | 3937 | 3 |
20 | 21 | Construction of a coastal road between the third bridge and Karun Street | - | 30 | 20000 | 3 |
21 | 22 | Scheduling and paving the west side of Farshid Street 2 | - | 100 | 400 | 3 |
22 | 23 | Repair of asphalt surfaces and drilling strips in the region | - | 40 | 6107 | 3 |
23 | 24 | Asphalt cover of Farshid St. 2, between Shahid Allaf and Malirah St. | - | 100 | 7420 | 3 |
24 | 25 | Infrastructure and asphalt of Zoyeh passages in front of Mellat alley | - | 30 | 666 | 3 |
25 | 26 | Construction of Aghajari town park | - | 90 | 3200 | 3 |
26 | 27 | Construction of Koi Niroo Park | - | 30 | 1775 | 3 |
27 | 28 | Construction of sports fields in the areas of 17 Shahrivar alley and Aghajari alley | - | 100 | 5500 | 3 |
28 | 29 | Construction of Kemerbandi Boulevard, Koi Naft Park and completion of Kondro and Ahvaz Mahshahr roads | - | 80 | 58124 | 3 |
29 | 30 | Construction of Golestan Cultural Center | East side of Kargar Square | 40 | 2100 | 4 |
30 | 31 | Construction of a pedestrian bridge in front of the city culture | Golestan Boulevard | 45 | 650 | 4 |
31 | 32 | Infrastructure and asphalt of a number of streets in the campus alley | Plot 92 of the campus alley | 55 | 2300 | 4 |
32 | 33 | Improving Niroo Water Park | Baharestan Alley | 70 | 2900 | 4 |
33 | 34 | Asphalt covering the streets of Bahman 22 alley | Bahman 22 Alley | 100 | 1600 | 4 |
34 | 35 | Infrastructure and asphalt of a number of streets of Pardis alley, phase 3 | Campus Alley | 100 | 4900 | 4 |
35 | 36 | Construction of Golfam Intersection Campus Park | Campus Alley | 85 | 2100 | 4 |
36 | 37 | Improvement of sewer valves in the area | Area level | 70 | 3800 | 4 |
37 | 38 | Construction of a west coastal park between the fifth bridge and Shaghayegh Park | Coastal Boulevard next to the fifth bridge | 80 | 2800 | 4 |
38 | 24 | Asphalt paving of paved streets | Golestan alley and campus | 100 | 6700 | 4 |
39 | 25 | Repair of asphalt surfaces and drilled strips in areas 1-5 and 8 | Area level | 36 | 2700 | 5 |
40 | 26 | Improvement and asphalting of main roads in the region | Ayatollah Behbahani Blvd. | 97 | 5000 | 5 |
41 | 42 | Infrastructure and asphalt of Mahdis alley | Mahdis Alley | 97 | 5393 | 5 |
42 | 43 | Infrastructure and asphalt of Mahdis dormitory of ABFA and Sugarcane Cooperative | Mahdis Alley | 97 | 4916 | 5 |
43 | 44 | Preparation - transportation, planting and storage of seedlings in the region | 18 hectare park | 97 | 500 | 5 |
44 | 45 | Construction of the holy defense element in the entrance square of Ahvaz from Abadan | Ahvaz entrance square from Abadan | 5 | 2075 | 5 |
45 | 46 | Improving the asphalt of streets in the area | Mahdis Alley | 97 | 5000 | 5 |
46 | 47 | Infrastructure up to the base layer of scattered passages in areas 2, 4 and 6 | Malachi | 100 | 3780 | 6 |
47 | 48 | Infrastructure to the base layer of the surrounding passages | Around Apadana Hospital | 100 | 2800 | 6 |
48 | 49 | Apadana Hospital | Area level | 100 | 8000 | 6 |
49 | 50 | Execution of asphalt coating | Baharan Street next to the standard office | 90 | 2700 | 6 |
50 | 51 | Construction of Baharan Park | Javan Ark Razmandegan Town | 88 | 2100 | 6 |
51 | 51 | Construction of a sports field | Javan Park of Razmandegan Town | 88 | 2100 | 6 |
52 | 52 | Landscaping of Krishan alley | Kerishan | 80 | 1500 | 6 |
53 | 53 | Infrastructure and asphalt of Malashieh alley streets | Malachi | 85 | 6070 | 6 |
54 | 54 | Infrastructure of the streets under the health of Ramadan alley | Ramezan Alley | 15 | 5000 | 7 |
55 | 55 | Infrastructure and asphalt of narrow passages | Area level | 20 | 1896 | 7 |
56 | 56 | Improving Laleh Park area | Laleh Park | 95 | 4310 | 7 |
57 | 57 | Construction of Niroo Sepidar Alley Park | Sepidar Alley | 0 | 340 | 7 |
58 | 58 | Construction of pedestrian highway bridge in the province | Velayat Highway | 95 | 1000 | 7 |
59 | 59 | Construction of the coastal road connecting Al-Safi alley | Al Safi Alley | 50 | 6000 | 7 |
60 | 60 | Construction of Foolad Shahr sports ground | - | 97 | 1030 | 8 |
61 | 61 | Construction of sports field phase 2 of Padad Shahr | - | 80 | 1030 | 8 |
62 | 62 | Infrastructure and asphalt around the salt market | - | 45 | 5560 | 8 |
63 | 63 | Repair of asphalt surfaces and drilled strips | - | 20 | 26000 | 8 |
64 | 64 | Infrastructure and asphalt of scattered streets in the region | - | 35 | 3417 | 8 |
65 | 65 | Construction of Honesty Square | - | 58 | 580 | 8 |
66 | 66 | Construction of the first phase of Susan Park | - | 97 | 3244 | 8 |
67 | 67 | Construction of Talab dormitory fire department | - | 97 | 2037 | 8 |
68 | 68 | Construction of Sadeghieh fire station | - | 80 | 1940 | 8 |
City of Ahvaz Ongoing Construction Projects - City - 2010
Dataset Period: 2010 - 2011File size: 5.8 KBFile format: CSV
DownloadOrginal Source File (FA)
Source: City of Ahvaz Department of Planning and Workforce DevelopmentFile size: 1.3 MBFile format: PDF
Download