Data Dictionary

Column Type Label Description
area under cultivation text
planned numeric
under construction numeric
operation numeric
total numeric

Additional Information

Last updated March 26, 2018
Created March 26, 2018
Format CSV
License License not specified
Notes

In the advanced search section, we should choose area under cultivation for the title, number for the item and statistics should be based on total list and the status of the dam should be chosen with three steps. In the original file the total number for planned is 537, for under construction is 146, for operation is 647 and for the total is 1330 but the real numbers after calculation is 359 for planned, 119 for under construction, 480 for operation and for the total the number is 958.

Publisher Iran Water Resources Management Company
Publisher URL http://www.wrm.ir/
Source

http://daminfo.wrm.ir/fa/dam/stats

Language English
Cleaning Stage Cleaned