Data Dictionary

Column Type Label Description
سال خاتمه text
مطالعاتی numeric
اجرایی numeric
بهره برداری numeric
مجموع numeric

Additional Information

Last updated March 26, 2018
Created March 26, 2018
Format CSV
License License not specified
Notes

In the advanced search section, we should choose end year for the title, number for the item and statistics should be based on total list and the status of the dam should be chosen with three steps. In the original file instead if year 1402 and 1403, 679 and 980 were mentioned. In the original file the total number for planned is 537, for under construction is 146, for operation is 647 and for the total is 1330 but the real numbers after calculation is 485 for planned, 145 for under construction, 616 for operation and for the total the number is 1246.

Publisher Iran Water Resources Management Company
Publisher URL http://www.wrm.ir/
Source

http://daminfo.wrm.ir/fa/dam/stats

Language Farsi
Cleaning Stage Cleaned